SeaPeople logo

St. Augustine, St. Johns County, Florida, USA

Mar 5, 2025 - Mar 5, 2025

Boat Work - Part 7 - Butt Job Nauti Dream has a plastic bumper on the transom which is mounted with screws going through the hull and below the waterline. Those screws have corroded and were causing leaks. We've removed the bumper, fiberglassed the deck to hull joint and added a small scoop to make getting on and off the boat a bit easier without having to lower the swim platform. Really excited for this upgrade and happy with the results so far.

© Copyright 2025 Sea People. All Rights Reserved.