SeaPeople logo

St. Augustine, FL, USA

Jan 21, 2025 - Jan 21, 2025

Boat Work - Part 4 - Stripping the Bottom With the engine and sail drive put back together, it's time to focus on stripping the bottom of the boat. We took it down to the gelcoat and will be applying two-part epoxy primer and anti-fouling paint. This is probably the most time consuming, dirty, and exhausting of all the jobs. Nauti Dream has an exceptionally long bow thruster tube which has been all cleaned up as well. Join our adventure here: https://youtube.com/@nautidream1?si=rnRF9nNIDuJsyyuK

© Copyright 2025 Sea People. All Rights Reserved.