Just made it before Onslow bridge closed for week all the way to beautiful Wrightsville Beach!
Elapsed time
10h 38m
Avg. speed
4.5kts
Distance
48.2nm
Moving time
--
Max. speed
-- kts
We barely made our passage through Onslow Bridge .. currents were against us most of the trip. Made it through with 3 minutes to spare before the bridge was shut down for rest of week for construction. Landed mid afternoon is a gorgeous little beach town, Wrightsville NC.. not sure if we were just starving but the pizza here at Vito’s was on point and so was the sunset. Will spend more time here on our trip north this spring for sure!
Swansboro, NC, USA
Nov 18, 2024 - Nov 18, 2024
Boat & Crew
Andiamo (currently Pau-Hana)
Beneteau, Oceanis 351