SeaPeople logo

Florida to Nova Scotia - Passage 5 - Hampton, VA to Annapolis, MD

Elapsed time

22h 11m

Avg. speed

5.8kts

Distance

129.1nm

Moving time

22h 11m

Max. speed

-- kts

Annapolis, Anne Arundel County, Maryland, USA

Jun 13, 2025 - Jun 14, 2025

We spent an additional week after our Hatteras crossing to recover and wait for boat parts to be delivered. Departed Hampton in the evening with following wind and waves. The waves died down through the night as we sail farther up the Chesapeake Bay. Saw dolphins and Cow-Nosed Rays. Wind shifted several times and ended up motor sailing much of the passage. Annapolis was very chaotic when we arrived, but were able to set anchor and rest.

Boat & Crew

Nauti Dream

Beneteau , Oceanis 45

© Copyright 2025 Sea People. All Rights Reserved.